Correct Answer
verified
Multiple Choice
A) scheduling
B) appointing
C) statistical forecasting
D) demand planning
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) all jobs must begin at the same time.
B) each job must be processed first on the first resource and then on the second.
C) a maximum of two jobs can be processed at a time on each resource.
D) total processing time must be minimized.
Correct Answer
verified
Multiple Choice
A) flow time
B) makespan
C) lateness
D) tardiness
Correct Answer
verified
Multiple Choice
A) shortest processing time rule
B) earliest due date rule
C) first come,first serve rule
D) fewest number of operations remaining rule
Correct Answer
verified
Multiple Choice
A) minimizes the maximum jobs past due.
B) maximizes average flow time of jobs past due.
C) maximizes resource utilization of jobs past due.
D) minimizes the average processing time of jobs past due.
Correct Answer
verified
Multiple Choice
A) flow time
B) makespan
C) lateness
D) tardiness
Correct Answer
verified
Multiple Choice
A) appointing
B) sequencing
C) statistical forecasting
D) demand planning
Correct Answer
verified
Multiple Choice
A) develop a factory layout.
B) track inventory levels over time.
C) monitor planned schedules.
D) forecast personnel requirements.
Correct Answer
verified
Multiple Choice
A) the processing time for each job on each resource is unknown
B) flow time is maximized
C) the goal is to minimize makespan
D) a job can be processed by either of its resources in any sequence
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) flow time
B) makespan
C) lateness
D) tardiness
Correct Answer
verified
Multiple Choice
A) maximize the number of jobs in the system.
B) maximize average flow time.
C) minimize resource utilization.
D) minimize work-in-process inventory.
Correct Answer
verified
Showing 1 - 16 of 16
Related Exams