Which Testing is performed ?rst?


A) black box testing
B) white box testing
C) dynamic testing
D) static testing

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

When should company stop the testing of a particular software?


A) after system testing done
B) it depends on the risks for the system being tested
C) after smoke testing done
D) none of the above

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

Bug status is set to postpone due to _.


A) priority of that bug may low.
B) lack of time for the release.
C) the bug may not be the major effect in the software.
D) data may be unavailable.

E) A) and C)
F) A) and D)

Correct Answer

verifed

verified

D

Non functional testing is performed only at system testing level. True or false.

A) True
B) False

Correct Answer

verifed

verified

Test cases are created in which phase?


A) test speci?cation
B) test planning
C) test requirement
D) test con?guration

E) B) and C)
F) A) and B)

Correct Answer

verifed

verified

Which of the following is not other name for structural testing?


A) white box testing
B) glass box testing
C) behavioral testing
D) none of the above

E) C) and D)
F) A) and C)

Correct Answer

verifed

verified

C

7n test cases are generated in which case of Boundary Value Analysis?


A) worst case
B) roust worst case
C) critical fault assumption
D) none

E) B) and C)
F) A) and B)

Correct Answer

verifed

verified

Veri?cation and Validation uses _.


A) internal and external resources respectively.
B) internal resources only.
C) external resources only.
D) external and internal resources respectively.

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified

When an expected result is not speci?ed in test case template then _.


A) we cannot run the test.
B) it may be di?cult to determine if the test has passed or failed.
C) it may be di?cult to repeat the test.
D) we cannot automate the user inputs.

E) C) and D)
F) B) and C)

Correct Answer

verifed

verified

A chronological record of relevant details about the execution of tests is called as, a _______


A) test suite
B) test procedure
C) test data
D) test log

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

D

End result of Software Requirement Analysis is _.


A) functional and behavioral
B) architectural and structural
C) usability and reliability
D) algorithmic and data structure

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

The expected results of the software is _.


A) only important in system testing
B) only used in component testing
C) most useful when speci?ed in advance
D) derived from the code.

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

___________ refers to a different set of tasks ensures that the software that has been built is traceable to Customer Requirements.


A) veri?cation
B) requirement engineering
C) validation
D) none of the above

E) B) and C)
F) All of the above

Correct Answer

verifed

verified

Which things are measured by software Test effectiveness?


A) how many customer requirements are implemented in system?
B) how well the customer speci?cations are achieved by the system?
C) how much effort is put in developing the system?
D) all of the above

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

Before handing over the software to the client, which testing is to be done in-house?


A) alpha
B) betta
C) gamma
D) theta

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

In which of the following type of testing, testing is done without planning and documentation?


A) unit testing
B) retesting
C) ad hoc testing
D) regression testing

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Which testing cannot be performed on ?rst build of the software?


A) regression testing
B) retesting
C) both a and b
D) none

E) C) and D)
F) A) and D)

Correct Answer

verifed

verified

Requirement Engineering is not concern with _.


A) requirement design
B) requirement elicitation
C) requirement analysis
D) requirement documentatio n

E) None of the above
F) A) and D)

Correct Answer

verifed

verified

Who leads a formal review process?


A) author
B) moderator
C) reviewer
D) scribe

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

Test wares are handed over to maintenance team during which phase?


A) test implementati on and execution
B) test closure activity
C) evaluating exit criteria and reporting
D) test analysis and design

E) B) and C)
F) B) and D)

Correct Answer

verifed

verified